Skip to main content
London Borough of Lambeth Home

West Dulwich Street Improvements

Lambeth council introduced the West Dulwich Street Improvements to reduce road danger and create a safer and healthier neighbourhood where residents can live happier, healthier lives.

The improvements included a trial of traffic restrictions to remove through-traffic, and enhancements to pavements across the neighbourhood.

The trial scheme was launched in September 2024 and removed in June 2025.

Click on the 'Phases' below to find out about different stages of the project.

Phases

Phases overview
Phase 1: Baseline Data Collection and Informative Engagement
Baseline Data Collection and Informative Engagement
Phase 2: Baseline Data and Informative Engagement Report
Baseline Data and Informative Engagement Report
Phase 3: Initial Design Engagement
Initial Design Engagement
Phase 4: Initial Design Report
Initial Design Report
Phase 6: Street Improvements Trial
Street Improvements Trial

Data Analysis

19 October 2026 23:00 - No end date

Data Analysis

This report presents monitoring data collected whilst the West Dulwich Street Improvements (traffic management measures) were in place as a trial. The report has been prepared by an independent transport consultancy, PJA Limited, on behalf of the London Borough of Lambeth. The report does not represent an evaluation of the trial, which was removed before completion, but is published to ensure transparency about the data collected during the trial’s operation.