
Brockwell Park to Gipsy Hill Healthy Route
The Brockwell Park to Gipsy Hill (also known as Rosendale Road) Healthy Route is key part of the Healthy Routes network. It connects several:
- neighbourhoods
- schools
- businesses
- workplaces
- green spaces
- amenities
- public transport hubs.
Lambeth is committed to creating streets and neighbourhoods that are healthy, safe, inclusive and pleasant. We want to enable the community to travel more actively, as this benefits public health and wellbeing, and is part of Lambeth's Climate Action Plan to become net zero compatible and climate resilient by 2030.
The Healthy Route network is part of Lambeth’s Transport Strategy The routes are convenient, safe and accessible to all. They can be on quiet streets where traffic levels are low or on main roads where dedicated space is provided for walking, wheeling and cycling.
The project has 4 phases:
- phase 1 - between Brockwell Park and Turney Road (built in 2021)
- phase 2 - between Turney Road and A205 South Circular (built in 2023)
- phase 3 - between A205 and Park Hall Road (in development)
- phase 4 - between Park Hall Road and Gipsy Hill station (In development)
Click the tiles below to find out more about the different phases.
Phases
Phase 2: Turney Road – A205 South Circular
Phase 2: Turney Road – A205 South Circular
Phase 2 of the Healthy Route was completed in November 2024, consisting of:
- New 3-metre-wide two-way cycle tracks (protected with traffic wands) along the eastern side of Rosendale Road, between Turney Road and the A205 South Circular.
- Converting the mini roundabout at the junction of Turney Road and Rosendale Road into priority T-junctions, including, new dropped kerbs and widened footway 'buildouts'.
- A new parallel zebra pedestrian and cycle crossing at the junction of Turney Road, connecting phase 1 and phase 2.
- A new zebra crossing on Turney Road, outside the entrances to Rosendale and Turney Primary Schools
- A new parallel zebra pedestrian and cycle crossing near the junction of Lovelace Road.
- A new zebra crossing adjacent to All Saints Church
- New areas of planting outside the entrances to Rosendale and Turney Primary Schools and outside the Rosendale Allotments
- New cycle parking stands along the route
The Decision Report for Phase 2 can be viewed here

0 projects
Filters
Total posts: 0No values available.
