Status Quo

The roundabout at Lambeth Bridge on the Albert Embankment already has a special cycle way which segregates cyclists turning right onto the bridge. This great design needs to be expanded for every other direction. The current roundabout is a concrete eyesore as of July 2024, with the trees in the roundabout having been cut down.

Proposal

The dark green shows the new cycle ways. The on-ramps and off-ramps are all modelled based on the existing roundabout cut-throughs. A mini cycle roundabout is shown at the centre of concrete roundabout. 

Benefits

The redesign will result in a better flowing roundabout for all road users and increased cyclist safety, where the traffic light timings are optimised for cyclists to encourage uptake. No longer would motor traffic be required to wait for cyclists to accelerate within the roundabout.

In addition, this would allow the joining up of cycle ways c8 and c5 between Westminster and Lambeth. The light green cycle path (with an appropriate box junction in front of Lambeth High Street) would allow proper and safe access to C5. 

Simple changes

The concrete eye sore will simply need the addition of the proposed route, and can be further improved with greenery.

Given the presence of traffic lights already within this roundabout, the only change needed would be to slightly modify the location of the advanced and normal stop lines to the location of the red boxes, to give space for cyclists to enter / exit the mini roundabout. This is already the case on 2 of the four exits due to the existing cut through, so in the traffic lights and stop lines only need to be adjusted on 2 of the exits.

Comments(1)

Commenting is not possible because this project is currently not active.
Most recent comments have loaded.
Profile of Aaron C-J
Posted by:Aaron C-J
2 years ago
I was notified on reddit that they are removing the roundabout in the next 3 months and thought I'd reflect that on this post. https://tfl.gov.uk/travel-information/improvements-and-projects/lambeth-bridge-northern-roundabout

    Share

    Posted by

    Current status

    proposed